Blog entries tagged with "eastlink"

Eastlink at night and a bridge removal

Sunday, January 18th, 2009 at 04:34pm

Last night Damien and I spent a few hours taking photos from various places around Eastlink before heading over to East Malvern where they had shut down the freeway to remove the pedestrian over-bridge. I have just finished uploading a selection of the photos to Flickr and here are some of them:

Eastlink at night

Pedestrian bridge over Eastlink at Koomba Road

Behind the ventilation stack on the Eastern Portal

East along Eastlink from Springvale Road

Removing the East Malvern pedestrian bridge

Preparing the lift the second span

Cutting the span free

Swinging the span between the cranes

Lowering the span onto the trailer

I also uploaded a couple of other recent(ish) photos:

Sunset on clouds from my window:

Sunset on the clouds from my window (2)

A handheld shot of the city at night:

Handheld shot of the eastern Melbourne CBD

and finally Alfie in his attention grabbing pink top:

Alfie in his pink top

Tagged with: , , ,

First decent ride in a while, to Belgrave and Ringwood

Sunday, January 20th, 2008 at 03:11pm

Yesterday Damien and I went on our first ride since last May, what was planned as a nice big loop that included Belgrave and Croydon.

First we went via Scoresby and Upper Ferntree Gully to Belgrave:

Glen Waverley to Belgrave (via Rowville and Upper Ferntree Gully) @ Bikely.com

The new bridge for the Eastlink Trail is well underway at the south end of Jells Park:

New bridge at south end of Jells Park (1)

And, despite the website saying otherwise, the upgraded trail south of Ferntree Gully Road is open:

Goat track to wide concrete

all the way to where Eastlink crosses the Dandenong Creek in Mulgrave:

No more detour up the hill

But some landscaping and cleanup is still to be done.

Since it drizzled for much of the ride to Belgrave we decided to catch the train to Ringwood and continue riding from there:

Ringwood to Glen Waverley (inc looking at Eastlink) @ Bikely.com

Paths near the Ringwood Bypass are done, but not yet open:

New path under EastLink in Ringwood

And the upgraded path through Koomba Park has been open for six months now:

Upgraded path through Koomba Park (1)

Apart from the drizzle it was an enjoyable ride and once Eastlink is complete there will be a decent network with many combinations to enjoy.

Part of what we skipped was a loop from Bayswater to Croydon (via the Tarralla Creek Trail), Ringwood (via the Upper Mullum Mullum Creek Trail) and back to Bayswater:

Bayswater, Croydon, Ringwood loop @ Bikely.com

Some more photos are available in my Bike paths and Eastlink (January 2008) Flickr set.

Tagged with: , , ,