The gaps are slowly being filled
Friday, July 18th, 2008 at 09:29pm
Over Easter last year I went for a ride to cover the new section of the Plenty River Trail that connected with the Yarra Trail and, at the top of the Yarra Trail, the Lower Mullum Mullum Creek Trail. Before being interrupted by a chain failure I ran out of path along the Mullum Mullum Creek.
Today, via the Bicycle Victoria email newsletter, I found out that a new section is under construction that will bring it closer to the EastLink Trail. It doesn’t reach all the way, but the final section is in the planning stages.
Gradually, as these gaps are filled, the Metropolitan Trail Network is becoming a real network. This makes it easy to get lots of variety for easy weekend rides as covering the same sections of path in the same order can easily get boring.
Then there are the long rides to consider. Now the EastLink Trail is open you can get from Craigieburn to Patterson Lakes on nothing but off-road paths. Which one ride I intend to do later in the year.
Tagged with: cycling